wpeA.jpg (16186 bytes)      This Secondary School was 160,000 sq. feet of concrete which  made this deconstruction  project one of the largest school demolitions in the lower mainland.
     Before the heavy equipment can start tearing at a building there is a lot of preparation work to be done. This can include the removal of hazardous materials such as Asbestos, PCB's, Mercury etc... Then after we have removed the hazards we will send in the salvage crews and the strip out crews to clean the building for the heavy equipment crews. Hillside south during.jpg (11852 bytes)


The two photo's above show the South Wing before and during demolition.
Below shows the West End of the North Wing partly demolished.

 